Grounding and bonding verification for raceways, equipment, shields and conductors, documented before energization.
Grounding and bonding faults are easy to miss and costly to find late. Sitewide verifies grounding and bonding as part of our low-voltage scope, so issues are found and closed before a hall is energized.
What we verify
- Grounding and bonding of raceways and equipment
- Shield and conductor bonding
- Continuity and insulation-resistance testing
- Phase-rotation and point-to-point testing
Documented, not assumed
Every result is recorded in our live electronic completions platform. Deficiencies become tracked punchlist items and stay visible to the owner until they are closed, through final inspection, turnover and energization.